HyStorIES

Hydrogen Storage in European Subsurface

EU Horizon 2020 project

Total budget: €2,499,911.75

Duration: 2021-2022

Point of contact: Kris Welkenhuysen

Summary

Renewable hydrogen combined with large scale underground storage enables transportation of energy through time, balancing out the impacts of variable renewable energy production. While storing pure hydrogen in salt caverns has been practiced since the 70s in Europe, it has never been carried out anywhere in depleted fields or aquifers. Technical developments are needed to validate these two solutions. As subsurface technical feasibility studies for a future hydrogen storage in depleted field or aquifer will be site-specific, as for other geology related activities, HyStories will provide developments applicable to a wide range of possible future sites: the addition of H2-storage relevant characteristics in reservoir databases at European scale; reservoir and geochemical modelling for cases representative of European subsurface, and tests of this representativeness by comparing it with results obtained with real storage sites models; and lastly an extensive sampling and microbiological lab experiment programme to cover a variety of possible conditions.